To the central content area

The Inspection and Certification Third Party on Due Recycled Waste(Waste Lubricants)

Absrtact
The execution results of the Project conducted by FTIS during the project period, April 01, 2005 to March 31,2006, can be summarized as following: 1.Certified recycled quantity:14,266,461 liters. 2.Certified disposal quantity:13,447,355 liters. 3.Analyzed by the chemical method, only 3.9% of the collected sample from recycling industry is composed with water/sediment percentage greater than 50%. Therefore the remediation fund for this part is not approved under EPA regulation. 4.There are 17 unqualified results for the equipment standard inspecting of recycling industry. No appropriate sign on the recycling truck and unqualified emergency extinguisher were the major causes. In the other hand, the unqualified reasons for the disposal industry were the barely readable checklist on extinguishers and contaminated oil storage. For those who unqualified above, FTIS will investigate continuously and ensure the future improvement. 5.In order to prevent violation, every entry truck must be inspected. There is no abnormal circumstance of the interior segregation within every recycling truck from April 01, 2005 to March 31, 2006. 6.For the monthly working environment safety inspection, the unqualified results in disposal industry are caused by contaminated oil storage and inappropriate shoes for the field crew. FTIS instruct the specific firms to absorb the contaminated oil by using cotton mod or saw dust, and educate the field crew to wear the appropriate shoes. Thus all the improvements have been implemented. 7.According to disposal industry, inspect the derivative waste storage environment and audit the inventory monthly. Also inspect and track the flow of the derivative waste and the recycled material. 8.There is no abnormal event regarding to the accounting auditing for recycling and disposal industry. 9.During the project period, FTIS evaluate the field inspections of 10 recycling firms and 2 disposal firms for subsidized qualification. 10.Total 88 abnormal events were found during the project period. 85 cases are closed and 3 cases are still in improving. FTIS will inspect and ensure the future improvement continuously. 11.Total 484 inspection trips are executed which achieves the highest-class goal of the project. 12.All inspectors are required to fulfill 40-hour training and examination at least. In addition, the in-job training is held monthly and the annual professional training was held. 13.FTIS promulgate the internal inspecting regulations for both systematic and executive examinations. All the flaws found by the internal inspecting crew were corrected.
Keyword
waste lubricant, inspection and certification third party, inspection and certification quantity
Open
top